Need metal parts ? Contact Taihe.

Product Description Technical information Engineering difficulty Remarks

Spring clamp metal,
Clamps stainless steel,
Pipe u clamp

1. Material: Stainless steel;
2. Surface treatment: None
3. Process: Progressive Stamping --- Number mark by tooling ---- Riveting --- Degreasing

1. Structure is complex;
2. Shape should be exactly round;
3. To save time and cost, both number code and riveting are made by progressive stamping

1. Tooling time: 16 working days
2. Production time: 16 working days
3. Usage: SafeAir – Drone safety system / Autonomous robot

PCI bracket

1. Material:
SPCC
2. Surface treatment:
Bright nickel plating.
3. Process:
Progressive Stamping --- Nickel plating --- Silk screen

1. Should pass 24H salt spraying testing;
2. Silk screen should pass abrasion testing.

1. Tooling time:13 working days
2. Production time: 12 working days
3. Usage: Convertible bike-stroller / Motor Vehicle

Corner bracket,
Stamping bracket

1. Material:
SPCC / Aluminum
2. Surface treatment:
Powder coating / Anodizing
3. Process:
Single Stamping --- Surface treatment

1. Nice surface, without bubbles or scratch
2. Should pass abrasion testing.

1. Tooling time: 13 working days
2. Production time: 12 working days
3. Usage: Airfield lighting systems / Family bike

Flat metal v galvanized bracket used in construction

1. Material:
SPCC
2. Surface treatment:
White zinc plating
4. Process:
Progressive Stamping --- Tapping by tooling --- White zinc plating

1. Should pass 24H salt spraying testing;
2. Unique white color, no color difference;
3. Tapping threaded holes automatically by tooling.

1. Tooling time: 16 working days
2. Production time: 16 working days
3. Usage: Connector / custom electronic and mechanical components / electric cable;power cable

Pipe hose bracket,
U shaped brackets.

1. Material:
Stainless steel
2. Surface treatment:
Polishing
3. Process:
Progressive Stamping --- Polishing

Strong strength
1. Tooling time: 12 working days 2. Production time: 12 working days 3. Usage: water metering / Fertilizer & Tillage Tools

C bracket.

1. Material:
Stainless steel
2. Surface treatment:
Heat treatment and black electrophoresis
3. Process:
Single Stamping --- Heat treatment --- Back electrophoresis

1. Good elasticity;
2. Coating can't be get off in abrasion environment.

1. Tooling time: 14 working days
2. Production time: 15 working days
3. Usage: water management / Vertical Farming

Sheet metal plate bracket,
Mounting plate.

1. Material:
SPCC
2. Surface treatment:
Powder coating
3. Process:
Single Stamping --- Powder coating

1. Stamp embossed pattern by tooling;
2. Coating can't be get off in abrasion environment.

1. Tooling time: 13 working days
2. Production time: 12 working days
3. Usage: LED Horticulture Lights / Offroad Auto Lighting

Galvanized steel bracket,
Bracket plate.

1. Material:
SGCC
2. Surface treatment:
None
3. Process:
Single Stamping

1. Strong strength;
2. Anti rust;
3. Low cost.

1. Tooling time: 14 working days
2. Production time: 12 working days
3. Usage: Industrial systems / Heaters

T shape bracket,
Z bracket.

1. Material:
SPCC
2. Surface treatment:
Powder coating
3. Process:
Single Stamping

1. Strong strength;
2. Nice surface.

1. Tooling time: 13 working days
2. Production time: 12 working days
3. Usage: Horticulture Ecosystem Controls / Diagnostic Tools

Metal v bracket

1. Material:
SPCC / SUS
2. Surface treatment:
Powder coating/ Zinc plating / Noe
3. Process:
Single Stamping --- Make Spring --- Make Cylinder --- Assemble these 3 parts

1. Pass 12 hours salt spraying testing;
2. Assemble tightly.

1. Tooling time: 14 working days
2. Production time: 13 working days
3. Usage: Home appliance / HMI (Human Machine Interface)

l bracket stainless steel,
OEM metal stamping

1. Material:
SUS
2. Surface treatment:
Mirror polishing
3. Process:
Single Stamping --- Polishing

1. Nice surface, shinny as mirror,
2. No burrs at all, very smooth surface;
3. Round R in each corner;
4. Add reinforcing rib to make it stronger.

1. Tooling time: 15 working days
2. Production time: 14 working days
3. Usage: Gateways / Elevators / Integrated systems

Mounting bracket,
Stamping u bracket

1. Material: SPCC
2. Surface treatment: Oil painting
3. Process: Progressive Stamping --- Black oil painting

1. Structure is a little complex;
2. After bending, the part should be round in opposite direction, easy to break, require fantastic craft in shaping process.

1. Tooling time: 15 working days
2. Production time: 14 working days
3. Usage: security sector / Security fogging system