Need metal parts ? Contact Taihe.

Product Description Technical information Engineering difficulty Remarks

EMI Shielding,
RF shielding,
RF EMI shield.
1. Material: Tinplate
2. Finish: None
1. Good flatness
2. Nice surface without any burrs or dots or scratch
1. Tooling time: 15 working days
2. Production time: 13 working days

EMI Shield,
RF shield cover,
PCB shield can.
1. Material: Nickel silver
2. Finish: Tin plating(Bright)
1. Thin and sharp legs of the RF shields should be kept well, without any deformation 2. Bright and shiny surface, should protect surface well, or dots will be obvious
1. Tooling time: 13 working days
2. Production time: 12 working days

EMI can,
EMI shield for PCB,
PCB RF shield.
1. Tinplate+ None (most cost-effective)
2. Nickel silver+ None/ Tin plating(Bright)
3. Stainless steel + None
1. Small edges, thin material but can't be deformed, should have good flatness
2. Black powder coating on such thin surface
1. Tooling time: 13 working days
2. Production time: 13 working days

EMI shielding can,
Metal shielding cover,
EMI shield stamping.
1. Tinplate+ None (most cost-effective)
2. Nickel silver+ None/ Tin plating(Bright)
3. Stainless steel + None
Series holes in concave surface
1. Tooling time: 12 working days
2. Production time: 12 working days

RF shielding case,
EMI shielding case.

1. Material: Nickel silver
2. Surface treatment: None
3. Process:
Progressive Stamping --- Riveting ---- Assembling

1. There are 36 pcs wings around the edges;
2. The base and bottom part should be assembled not tight and not loose;
3. Nickel silver is soft, this part haven't surface treatment, meanwhile scratch or mark are not acceptable;
4. Nice surface without corrosion.

1. Tooling time: 14 working days
2. Production time: 13 working days
3. Usage: Ride Vision System / Advanced Rider Assistance System for Motorcycles

RF shield,
EMI shield.

1. Material: SUS
2. Surface treatment: None
3. Process:
Progressive Stamping

1. Wings are elastic;
2. Assemble well with cables.

1. Tooling time:13 working days
2. Production time: 12 working days
3. Usage: Smart home gateway / Wide-angle cameras

EMI shield boxes,
RF shield boxes.

1. Material: Tinplate / SPTE
2. Surface treatment: None
3. Process:
Progressive Stamping

1. Various holes, no burrs at all;
2. Anti rust;
3. Low cost;
4. Can be welded easily.

1. Tooling time: 14 working days
2. Production time: 13 working days
3. Usage: Indicators and control elements / Bicycle Light

RF shielding frame

1. Material: Tinplate / SPTE
2. Surface treatment: None
3. Process:
Progressive Stamping

1. Flatness requirement is strict as 0.05mm;
2. Bending height is small, hard to form;
3. Assemble tightly with cover.

1. Tooling time: 13 working days
2. Production time: 12 working days
3. Usage: Brain health mapping system / Power mount system / Work lights

RF shielding panel

1. Material:
Nickel silver
2. Surface treatment:
Bright tin plating
3. Process:
Progressive Stamping --- Bright tin plating

1. The surface should be very shinny;
2. Without any scratch or dot.

1. Tooling time: 12 working days
2. Production time: 12 working days
3. Usage: Mazor X – Robotic system for spine surgery / PCBA

EMI shield can

1. Material:
Aluminum
2. Surface treatment:
Clear or Black anodizing
3. Process:
Progressive Stamping --- Anodizing

1. Deep drawing structure, without slot in these 4 corners;
2. Nice surface, without any scratch.

1. Tooling time: 12 working days
2. Production time: 12 working days
3. Usage: SPECT/CT – Imaging system / Electron microscopy

emc electronics shield

1. Material:
Nickel silver
2. Surface treatment:
None
3. Process:
Single Stamping

The legs are easy to deformed, should shaping well.

1. Tooling time: 13 working days
2. Production time: 12 working days
3. Usage: PCB Assembly / SMT insertion

PCB shield cover

1. Material:
Nickel silver
2. Surface treatment:
None
3. Process:
Single Stamping

1. Shape should be exactly round;
2. The surface should be very nice, without scratch;
3. The legs are should bended at same horizontal line.

1. Tooling time: 13 working days
2. Production time: 12 working days
3. Usage: Analytik Jena Equipment / confocal microscopy

EMI shield,
EMC shield

1. Material: Tin Plate
2. Surface treatment: None
3. Process:
Progressive Stamping --- Degreasing

1. Various holes, no burrs at all;
2. Anti rust;
3. Low cost;
4. Can be welded.

1. Tooling time: 14 working days
2. Production time: 13 working days
3. Usage: Televisions / lithium-ion batteries

EMI shielding gasket,
Stamping metals parts

1. Material: Tin Plate
2. Surface treatment: None
3. Process:
Progressive Stamping --- Degreasing --- Assemble together

1. Various holes, no burrs at all;
2. Anti rust;
3. Assemble well.

1. Tooling time: 15 working days
2. Production time: 14 working days
3. Usage: Newa – Anti-aging device / Printing Machinery Parts

Scroll to Top